2. The tug
reversed course and took the Brent Spar to a Norwegian fjord port to await a decision about its disposal.
拖船改变航向,将布兰特史帕尔储油平台拖往挪威一峡湾的海港,等待后续的处置决定。
3. Discussed the pump pressure, installation of the balance valve and the design effectiveness of
reversed return water system.
对水泵压力、平衡阀的设置、系统同程设计的有效性等作了初步的讨论。